We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method(frp) - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

Construction method Product List

1~30 item / All 53 items

Displayed results

Mechanical Fixed Method for Rooftop Waterproofing with FRP Sheet Covering

A system where all materials and construction methods are fully recyclable! Introduction to mechanical fastening methods.

The "Rooftop Waterproofing FRP Sheet Cover Method" is a mechanically fixed method that allows for a 30-year waterproofing lifespan, contributing to the longevity of buildings. In the "Ecological Dry Method," the overlapping parts of the sheets are pressed together using waterproof materials, adhesives, and adhesive tape. Since there is no FRP lining, odors and construction time are significantly reduced. In addition, we also offer methods such as the "Durable Joint FRP Lining Method" and "Ecological Dry Method + Rooftop Waterproof Air Control." 【Features of the Ecological Dry Method】 ■ High durability for 30 years ■ Dry adhesion of joints ■ Wind pressure resistance ■ Lightweight at 3.5 kg/m2 ■ Recyclability *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP tank lining method

Extend the life of the liquid contact tank and piping with lining and coating!

The "FRP Tank Lining Method" regenerates and extends the life of aging underground tanks at low cost and in a short period of time. It stops the progression of corrosion in existing underground tanks and prevents leaks. Losses caused by corrosion (decay areas) are compensated by forming an FRP layer after cleaning. This method has achieved significant cost reductions compared to traditional tank replacement work. 【Features】 ■ Low Cost - Approximately one-third the cost of tank replacement ■ Construction Period - One 10kl underground tank: about 10 days - Simultaneous construction of four tanks: about 15 days (without manholes) *For more details, please refer to the PDF materials or feel free to contact us.

  • tank
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drainage Pipe Lining Method "P.C.G FRP Supporter Method"

A method to create a new FRP pipe inside an existing pipe to solve issues such as leaks.

We offer the 'P・C・G FRP Support Method' to solve various problems associated with aging pipes. We create new FRP pipes inside old pipes. Please feel free to contact us if you have any inquiries. 【Construction Achievements】 ■ Narita Airport Terminal 2 ■ Tsukuba Factory, Tsukishima Food Industry ■ Ogikubo Minami City House ■ Greenard Nagayama ■ Cracks Totsuka, etc. *For more details, please download the PDF or contact us.

  • Piping Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP Special Coating Method (R)

We will achieve the long lifespan of factory structural components through coating.

Our company offers a special FRP coating method (R) that combines the strengths derived from GFRP material forms and the proven corrosion-resistant resin functions as a role of paint. By combining glass fibers and corrosion-resistant resins in an appropriate material composition, we achieve high corrosion resistance. Please feel free to contact us if you have any inquiries. 【Features】 ■ Sealing the "interface of fibers/resin near the surface" that is prone to acid penetration with a top coat ■ Suppression of acid penetration by glass fibers and enhancement of the strength of the coating itself *For more details, please download the PDF or feel free to contact us.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP molded product roof covering method

Extending the lifespan of buildings! We will introduce construction methods that enhance roof strength and improve roof corrosion resistance.

The "FRP Molded Product Roof Covering Method" allows for waterproofing simply by covering with FRP molded products (such as tile bars, slate roofs, and folded plate shapes) instead of applying waterproof coatings or sheets. This method is lightweight, ranging from 2.5 to 5 kg/m², which reduces the load on the roof, makes installation on sloped roofs easier, and enhances the safety of workers. It is possible to install FRP molded products with a maximum length of 13 meters, which, combined with their lightweight nature, can shorten construction time. 【Features】 ■ Waterproof by covering ■ Lightweight ■ Shortened construction time ■ Energy-saving ■ Recyclable materials and methods *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP molded product roof cover method

Achieve waterproofing for your roof simply by covering it with FRP molded products (tile rods, slate roofs, folded plate shapes)!

This construction method allows for waterproofing simply by covering with FRP molded products (such as tile bar, slate roofs, and folded plate shapes) instead of applying waterproof coatings or sheets. Due to the lightweight nature of FRP molded products, weighing only 2.5 to 5 kg/m², it reduces the load on the roof. It also makes installation on sloped roofs easier and enhances the safety of workers. It is possible to install FRP molded products up to 13 meters in length, which, combined with their lightweight, leads to a reduction in construction time. 【Features】 - Lightweight and reduced construction time - Energy-saving - Recyclable materials and methods - Increased longevity of buildings, enhanced roof strength, and improved corrosion resistance of roofs - Insulation method *For more details, please download the PDF or contact us.

  • Other services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion resin lining system Shukura

Standardizing stable quality through construction method design suitable for the purpose 'Shukura'

We have standardized stable quality with excellent performance in high water resistance, durability, and chemical resistance, primarily using FRP, through method design suitable for various applications. Additionally, to consider the construction environment, we have achieved "low odor" and "low solvent" formulations. We have obtained certification from the Japan Sewage Works Agency based on the "Concrete Corrosion Prevention Guidelines and Various Tests." For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition

Flexible urethane coating + durable FRP composite waterproofing method. Certified by the Minister of Land, Infrastructure, Transport and Tourism, fire spread certification obtained [Certification Number DR-0700] specifications.

The "Poly Roof PP Method Series" achieves cost reduction in structural materials of buildings by lightweighting the materials. While the "Asphalt Waterproofing + Protective Concrete Finish" weighs 130 kg/m², the "Poly Roof Pp-1V Method" weighs only 5.1 kg/m². There is no need for protective concrete, joint materials, or finishing boards. Since it can be constructed solely by waterproofing specialists, speedy construction is possible. It is fully equipped to handle salt damage and bird damage, and it is resistant to gasoline and oil, boasting excellent stain resistance and aggregate retention performance. Maintenance after construction is easy, and ancillary equipment can also be installed. For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining method 'SST2-Spray Up'

Achieve cost reduction and short-term construction. In addition to a 10-year warranty, you can also enroll in oil leak insurance.

"SST2-Spray Up" is an FRP lining method that can be completed in as little as 3 days. It can be applied to a wide range of tank types, including above-ground tanks (large and extra-large tanks) and underground tanks. Additionally, the glass fibers form a uniform 3D structure, achieving high strength. Furthermore, there are no unpleasant odors typically associated with conventional FRP lining sites. 【Features】 ■ Safe and secure ■ Completed in just 3 days ■ Strong high corrosion resistance ■ High strength and durability ■ Low cost *For more details, please refer to the PDF materials or feel free to contact us.

  • Processing Contract
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Prototype construction method "Body Prototype FRP Material"

For prototypes of automobile bodies! Body prototypes that can be integrally molded with complex shapes.

At Torigoe Resin Industry, we are conducting prototype production of FRP bodies. We provide a consistent service from mold data creation to molding and finishing, tailored to our customers' requests. We can achieve integrated molding of complex shapes, resulting in higher strength than segmented products. 【Features】 ■ Consistent production tailored to requests ■ Integrated molding of complex shapes is possible ■ Higher strength than segmented products *Please feel free to contact us for more details.

  • Contract manufacturing
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cutting soil reinforcement method "Green Panel (FRP pressure plate method)"

Easy to install and significantly shortens construction time! This method is also suitable for reverse installation.

This construction method involves fixing FRP lattice-shaped green panels as slope protection materials with reinforcement at the top, utilizing the tensile strength of the reinforcement to prevent slope collapse. By spraying materials such as soil onto this part, full greening, which was difficult with conventional slope protection methods, becomes possible. 【Features】 ■ NETIS Registration No. CG-010007-V ■ Lightweight at 16.8 kg due to being made of FRP ■ Easy to install ■ Significantly reduces construction time ■ High opening ratio due to lattice shape, enabling full greening *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforcement and Corrosion Protection Method: "FRP Winding Method"

Laminating fiber-reinforced sheets, we wrap and reinforce the perforated column from the outer circumference of the foundation.

The "FRP Winding Method" is a technique that covers the entire buried portion of streetlights, including corroded areas, with fiber-reinforced sheets (FRP) that have strength and corrosion resistance equal to or greater than that of metals. While using conventional poles, it is possible to reduce costs for replacements. This method prevents natural collapse of streetlights and road sign poles as well as collapse during seismic disasters. 【Features】 ■ Prevents the collapse of corroded road lighting poles ■ Stronger than new metal pipes ■ Remarkable corrosion resistance ■ Allows for cost reduction in replacements while using conventional poles *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method "Cute FP System"

Demonstrates highly reliable waterproofing capabilities on verandas, rooftops, balconies, and more!

The "Cute FP System" is a reliable FRP lining waterproofing method with a robust seamless waterproof layer. The exposed waterproof layer for walking is lightweight and equipped with excellent waterproofing and durability. The waterproof layer made of elastic polyester follows the movement of the substrate and has excellent adhesion. Additionally, it features a polyester resin waterproof specification that reduces the characteristic odor of polyester resin during construction. 【Features】 ■ Highly reliable waterproof performance ■ Lightweight and durable waterproof layer ■ Excellent adhesion and follows the movement of the substrate ■ Reduces unique odors during construction ■ Easy to install, requiring no special skills or tools ■ Short construction period *For more details, please refer to the PDF document or feel free to contact us.

  • FRPライニング防水工法『キュートFPシステム』3.JPG
  • FRPライニング防水工法『キュートFPシステム』5.JPG
  • FRPライニング防水工法『キュートFPシステム』6.JPG
  • FRPライニング防水工法『キュートFPシステム』8.JPG
  • FRPライニング防水工法『キュートFPシステム』9.JPG
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Residential Foundation Seismic Retrofit: FRP Grid Foundation Reinforcement Method

Construction while living in the house is possible! A new seismic reinforcement method for residential foundations that can be applied even in small spaces has arrived!

In conventional residential foundation reinforcement methods, long curing periods were often required due to construction convenience and the need to secure working space, making it difficult to carry out work while living in the home. The "FRP Grid Foundation Reinforcement Method" achieves both construction in narrow spaces and while living in the home. The method involves "chipping away the decorative mortar of the existing foundation" → "fixing an FRP lattice to the existing concrete with anchor pins" → "applying a special mortar at a minimum thickness of 15mm," making it possible to carry out construction even on small sites without the need to relocate outdoor units, piping, gutters, etc., or to remove flooring materials. Additionally, it is possible to complete the construction in an unprecedented short time of as little as 3 days. 【Necessary Qualifications for Design and Construction】 ■ Designer - First-class/Second-class/Wooden Architect - Participants of the "Seismic Diagnosis and Reinforcement Methods for Wooden Houses" seminar (organized by the Japan Architectural Disaster Prevention Association, etc.) - Participants of the technical seminar organized by our company ■ Constructor/Construction Manager - Participants of the technical seminar organized by our company *The technical seminar organized by our company is conducted in a format where the responsible person visits directly.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing and corrosion prevention method "Airtight"

Introducing composite and multifunctional construction methods! For deterioration prevention, longevity, leakage prevention, waterproofing, and corrosion protection.

"Air Tight" is a composite design of FRP lining waterproofing and anti-corrosion method that combines adhesion, waterproofing, and corrosion resistance. It is a multifunctional type that demonstrates the required performance under various environmental conditions. It is not affected by the alkaline nature of concrete. Additionally, the coating of concrete requires crack-following ability, and this method enhances crack-following ability through high strength and flexibility. 【Features】 ■ Suppresses the occurrence of pinholes ■ Long-term durability ■ A surface deterioration type that can be assessed visually for peace of mind ■ Ease of maintenance management ■ Can reduce life cycle costs *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining method "SST3-Dual Wall"

A structure that realizes a future-oriented tank lining. It can completely eliminate concerns about leakage accidents.

The "SST3-Dual Wall" utilizes existing single-shell tanks by converting the interior to a double-shell structure and incorporates a leak detection system into a newly established detection layer, creating a futuristic tank lining. With the implementation of a constant monitoring system through the leak detection system, it has become possible to operate facilities with enhanced safety. Additionally, by adopting the tank lining system with an integrated leak detection layer, it will be possible to detect minor leaks before they lead to soil contamination incidents. 【Features】 ■ Continuous monitoring of leaks is possible ■ The double-wall lining structure eliminates concerns about leak accidents ■ High cost-effectiveness and durability ■ Installation by WALFTANK Corporation *For more details, please refer to the PDF materials or feel free to contact us.

  • tank
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shuanghe Chemical Industry Purela

FRP anti-corrosion method for water supply facilities "Pura"

The Purela method is an FRP lining technique for water supply facilities. It is a waterproofing and anti-corrosion method that maximizes the characteristics of FRP lining by combining vinyl ester resin with glass mat, which excels in water resistance, corrosion resistance, and crack-following ability. The finished state after construction is seamless, ensuring a thick layer and resulting in the installation of an FRP molded tank on the inner surface of the distribution reservoir.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Parking lot waterproofing removal work - Terminator removal method

Removal of various types of flooring in a short period! Our company has five Terminator machines.

The "Terminator Removal Method" uses a riding-type removal machine to remove various types of flooring materials, such as hard polyurethane and FRP, which are typically difficult to remove, from surfaces like parking lot floors. The work is performed while riding on the machine, which reduces noise and vibration. It allows for the removal of flooring materials at an overwhelming speed. 【Removal with the Terminator Machine for Parking Lot Renovation】 - In parking lot renovation work, it is essential to remove the existing waterproofing. - The existing waterproof layer in parking lots often has issues with water intrusion or poor adhesion to the structure. - To ensure proper construction, the waterproof layer must be removed. - It is necessary to expose the sound structure using grinding machines and shot blasting machines. *For more details, please refer to the related link page or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cubicle FRP Cover Method

A groundbreaking construction method has emerged as a life extension measure for cubicles!

The appearance of the cubicle has started to rust! The budget for replacement is... it would also involve extensive construction! However, leaving it as it is poses a danger... To solve the owner's concerns, the "FRP Cover Method" has been devised. It has excellent electrical insulation and heat shielding properties. It is highly weather-resistant, with less degradation from sunlight, wind, rain, and seawater compared to metal and PVC, and it can withstand wind pressure, snow load, and weight. Additionally, it has excellent corrosion resistance, with advantages such as being rust-proof, rot-proof, and resistant to water and oil. Furthermore, it has good moldability and cost-effectiveness, allowing for easy shaping and construction of complex forms on-site (design can be freely colored), and it can be tailored to meet requests based on environmental conditions, shapes, and special circumstances. It is lightweight (25% of steel), has strength comparable to general metals, high elasticity, impact resistance, and chemical resistance that surpasses that of metals. For more details, please contact us or refer to the catalog.

  • others
  • Surface treatment contract service
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method 【Aquarium facilities】

It prevents the deterioration of concrete and protects the rebar due to its waterproof and salt-resistant properties!

Concrete structures in fisheries and aquarium facilities are eroded by seawater and saltwater, leading to deterioration and aging, particularly resulting in explosive phenomena due to rust and corrosion of rebar caused by salt. The "Airtight FD Method" prevents concrete deterioration and protects rebar through waterproofing and salt resistance. In fisheries and aquarium facilities, we propose measures to prevent aging and extend lifespan, which can reduce lifecycle costs, based on the required functionalities and performance, as well as over 20 years of durability track record. 【Features】 - Safe materials that do not affect water quality - Prevents external water quality contamination - Good curing properties with no concerns about poor curing - Finished in colors considerate of biological growth - Maintains color and performance over a long period *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method [water channels and water resource facilities]

A material with high strength in a thin film! It can suppress the reduction of flow accumulation and ensure flow rate and flow velocity.

Concrete structures of agricultural water management facilities are deteriorating and aging due to erosion and neutralization phenomena caused by water and flowing water. The "Airtight ND Method" uses a high-strength thin film material that can suppress the reduction of flow accumulation and ensure flow rate and velocity. In agricultural water management facilities, we propose measures to prevent aging and extend lifespan, which can reduce lifecycle costs, based on the required functions and performance as well as over 20 years of durability track record. 【Features】 ■ Safe material that does not affect water quality ■ Prevents external water quality contamination ■ Good hardening properties, allowing construction even in low winter temperatures without concerns about poor hardening ■ High strength with excellent impact resistance and abrasion durability ■ Can be finished in a variety of colors to match the landscape *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sewer Composite Manhole Rehabilitation Method "Eba Sheet Method"

Long-lasting corrosion-resistant manholes! A sewer composite manhole rehabilitation method that achieves material savings.

The "Evashito Method" is a composite manhole rehabilitation technique that involves attaching an "FRP sheet" to the inner wall of an existing manhole that has advanced corrosion, using an expansion frame, and filling the gap between the sheet and the existing manhole with mortar. The backside treatment of the FRP sheet creates a rough surface with the adhered silica sand, enhancing the adhesion strength with the filling material and achieving a complete integration with the existing manhole, resulting in strong durability. No heavy machinery is required, and no special skills are needed, allowing for construction in a small road occupancy area. By utilizing the existing manhole, material savings are achieved, along with a reduction in construction time, resulting in excellent cost-effectiveness. 【Features】 ■ High quality ■ High speed ■ Low cost ■ Can be constructed in a small road occupancy area ■ Achieves material savings by utilizing existing manholes *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete anti-corrosion coating method "Zick Board Method"

Achieving high durability through integration with concrete! Suitable for facilities in harsh environments.

The "Zick Board Method" falls under the sheet lining method and is a concrete corrosion protection coating method suitable for facilities in extremely harsh environments or those requiring long-term durability. A multi-layer molded board (Zick Board) is formed by integrally molding a three-dimensional cross on the back of a high-durability vinyl ester resin FRP sheet, which is then directly bonded to the structural concrete or the poured concrete through acid-resistant inorganic grout, creating an integrated corrosion protection layer. 【Features】 - Suitable for facilities in harsh environments or those requiring long-term durability - Provides excellent barrier properties with a homogeneous high-density corrosion protection layer - The joints of the post-application method prevent damage to the joint area due to stress concentration, imparting excellent durability functions - The three-dimensional cross prevents the coating layer from cracking due to structural cracks and damage *For more details, please refer to the PDF document or feel free to contact us.

  • Calibration and repair
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method【Water treatment facility】

Maintains performance over a long period! The deterioration status can be visually assessed, making repairs easy.

The concrete structures of water treatment facilities are subject to deterioration and corrosion due to erosion from wastewater and the intrusion of gases generated. Even when coated with anti-corrosion materials, deterioration progresses from areas where pinholes or cracks have formed that cannot follow the anti-corrosion material. The "Airtight Construction Method" is designed with a focus on corrosion resistance, crack-following capability, and measures to suppress pinhole formation. In water treatment facilities, we propose corrosion prevention and long-life measures that can meet the required performance capabilities and reduce life cycle costs based on long-term durability records. 【Features】 ■ Excellent acid and alkali resistance ■ Excellent chemical resistance ■ Prevents the occurrence of pinholes due to the characteristics of the countermeasure process and materials ■ Prevents contamination of groundwater and soil due to wastewater leakage ■ Good curing properties with no concerns about poor curing *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method [Snow prevention facility]

It is difficult for ice and snow to adhere, making it easy for snow to flow away! Due to its high waterproof and corrosion-resistant properties, it prevents the deterioration and aging of facilities.

Concrete structures of snow mitigation facilities are deteriorating and aging due to phenomena such as carbonation, freeze-thaw damage, and salt damage caused by the use of de-icing agents. The "Airtight SD Method" prevents the deterioration and aging of facilities due to its high waterproofing and corrosion resistance, and its low roughness coefficient makes it difficult for ice and snow to adhere, allowing for easier snow runoff. In snow mitigation facilities, we propose long-term durability measures that can reduce lifecycle costs through functions and performance that meet required specifications, backed by a long track record of durability. 【Features】 ■ Excellent salt resistance against de-icing agents ■ Maintains performance even in low-temperature environments ■ Surface that is difficult for ice and snow to adhere to ■ Low roughness coefficient ensures flow rate and velocity ■ Slip-resistant finish to prevent slipping and falling *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method【Sewerage facilities】

The design emphasizes corrosion resistance, crack-following ability, and measures to suppress pinholes!

The phenomenon of concrete corrosion in sewer facilities is known to occur due to the generation of sulfides by sulfate-reducing bacteria in sewage sludge. Hydrogen sulfide gas, which is released from the liquid phase to the gas phase, dissolves in condensation water and progresses due to sulfuric acid produced by sulfur-oxidizing bacteria. Even when a protective material is coated, corrosion progresses from areas where pinholes or cracks have formed in the protective material, which cannot keep up with the cracking, leading to breakage or fissures. The "Airtight Method" is designed with a focus on corrosion resistance, crack-following ability, and measures to suppress pinholes. In sewer facilities, we propose measures for reducing lifecycle costs and extending service life based on functions and performance that meet the required specifications and long-term durability records. 【Features】 ■ Maintains performance over a long period ■ Deterioration can be visually assessed, making repairs easy ■ High strength and flexibility enhance crack-following ability ■ High corrosion and chemical resistance, capable of handling special wastewater inflows *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shuanghe Chemical Industry Bathing Space

Bathroom renovation method 'Yokuhari Space' proposed by FRP waterproofing manufacturers.

The waterproof pan of a collective housing bathroom that is over 20 years old poses a risk of leakage due to aging. To prevent troubles before they occur, we recommend repairing or replacing the old waterproof pan. You can choose the construction method based on the shape and condition of the bathroom. Additionally, for the renovation of traditional bathrooms (tiled bathrooms), "bathroom space" is the best option. We will renovate the floor, walls, and ceiling of the bathroom that cannot accommodate a unit bath to have a 'unit bath style.'

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Special anti-slip construction method "Non-Slip Clear"

By using a clear resin paint, it is possible to apply a slip-resistant treatment while preserving the color and pattern of the original flooring material.

"Non-Slip Clear" is a slip-resistant construction method that uses a clear resin slip-resistant flooring material. Since the appearance remains almost unchanged after installation, it is suitable for places where design is a priority. It has good workability, allowing light foot traffic in as little as about 3 hours. It can be applied mainly in public facilities, factory floors, stairs, and bathrooms. 【Features】 ■ Stain resistance ■ Sick house compliant ■ Chemical resistance ■ Short installation time ■ Colorless paint *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tunnel excavation auxiliary method "Injection Forepoling"

Introducing tunnel excavation support methods for preventing the collapse of the cutting edge and the expansion of looseness!

"Injection-type Forepolling" is an auxiliary excavation method that combines injection materials and bolt materials to perform pre-support and consolidation improvement of the ground. Its primary purpose is to prevent the collapse of the tunnel face and to stop the expansion of looseness during tunnel excavation. Please contact us if you require our services. 【Construction Method (Partial)】 < Hallow/FRP Bolt > ■1. Drilling ■2. Bolt insertion ■3. Mouth closure ■4. Injection *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-stop water construction method "FDNS method"

The replacement period for the water tank is 25 years! We recommend updating the construction!

The "FDNS Method" is our original "non-stop water construction method" that allows for construction without water interruption during the renewal of existing water tanks. It is compatible with all manufacturers, including FRP, steel, and stainless steel panel tanks. Pipe and pulp renewal work can also be carried out simultaneously. 【Advantages】 ■ Replacement construction utilizing the structure of the water tank ■ No water interruption during renewal work (switching time is minimized) ■ Shortened construction days and reduced costs ■ Bolt assembly type that does not use welding or open flames ■ No need for temporary water tanks or temporary pumps ■ Complies with new seismic standards *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration